Case study on the fabrication, assembly and installation at Techport, Adelaide, of the largest shiplift facility in Australia. The Common User Facility (CUF) has been designed to facilitate the building and repair of a number of vessels simuultaneously. In: steel Australia, vol 23, no 1.
Related Content