A long-span bridge above the future entrance of the Metro Tunnel near William Street in Melbourrne's South Yarra, has been constructed with the use of high-grade steel supplied by Infrabuild Steel Centre. In: steel Australia, autumn 2020, pp. 26-27.
Related Content