This case study briefly describes the design and construction of two new classroom blocks at Wyong Christian Community School. The single storey buildings are elevated 1500 mm above a flood plain and use structural steel portal frames with a light gauge steel floor system and roof purlins. Steel Australia March 2007.
Related Content