Steel framed way speeds Brizzie bridge build sa_mar08

Steel framed way speeds Brizzie bridge build sa_mar08

Case study of Eleanor Schonell Bridge, a cable-stayed walkway, bicycle and bus route over the Brisbane River. This Design and Construct project included constructing the deck from both river piers simultaneously and attention was paid to maximising offsite fabrication and dealing with runoff.

Title
Steel framed way speeds Brizzie bridge build sa_mar08
Publish Date
03 May 2018
Attachments
Download

Related Content