Three rail overbridges (road over rail bridges) along NSW RailCorp’s main Western line at Station Road and Alice Street, Auburn and another over the Northern line at Copeland Road, Beecroft required integrated design solutions to overcome geometric and site-specific constraints. The design adopted for all three bridges comprised a superstructure of steel trough girders made composite with a cast in-situ reinforced concrete deck cast onto precast concrete deck slabs spanning between girder flanges. In: steel Australia, vol. 24, no. 2, Jun 2011.
Related Content