New crossing build time abridged. Collie River Bridge, Treendale WA

New crossing build time abridged. Collie River Bridge, Treendale WA

A steel-intensive approach has facilitated the installation of a major new crossing over the Collie River in the South-Western region of Western Australia from terrain not able to support heavy cranes and has cut almost two months from the construction time. In: steel Australia, v30n4, pp.32-33.

Title
New crossing build time abridged. Collie River Bridge, Treendale WA
Publish Date
03 May 2018
Attachments
Download

Related Content