Fabricated in Australia by AGC as the main contractor, the project used 2800 tonnes of structural steel in total, with 1300 tonnes on the jacket alone, 585 tonnes in the topside section, 800 tonnes for the piles and 115 tonnes for miscellaneous installation aids.