A heritage-listed railway bridge originally opened in 1881 crossing the Macquarie River in regional NSW has been restored to be even more resilient than it was 133 years ago with deft planning allowing the steelwork to be installed onsite within a tight 16-day window.
In: steel Australia, vol. 27, no. 4, Dec 2014, pp. 22-23.
Related Content