Membership options for companies: Fabricators, Professionals, Distribution Centres.
Membership options for individuals, students and academics.
Unsure about becoming an ASI member or which type you should choose?
ASI Members can access exclusive deals with our new motoring package
Read more about what the ASI does for your industry.
Find out more about the ASI and who we represent.
Purchase books, download tech notes and request library resources.
Read the latest steel industry news or book in for a webinar or our upcoming Steel Convention
Related Content
Integrating construction process documentation into Building Information Modeling [BIM]
Code of practice for structural steelwork documentation
Causes, effects and indicators of design and documentation deficiency
AS/NZS 1519:1997 Information and documentation. International standard book numbering (ISBN)
Indicators of design and documentation deficiency
Wind-induced vibration response of modular high-rise buildings
NASH Handbook: Design of residential and low-rise steel framing
Reducing embodied carbon in seismic design of new buildings
Please do not press back or reload the page.