89,000sqm Big W's new distribution centre in Hoxton Park is possibly one of the largest portal frame structures in the Southern Hemisphere to date. Sebastian Engineering integrated the drawing, processing, fabrication, delivery and erection on a Just in Time (JIT) basis. The flexibility and speed of construction was a major reason for steel being chosen as the structural element for this project. In: steel Australia, vol. 24, no. 1, March 2011.
Related Content